Article Details

Beneath the surface: A look inside the $450M Annacis Water Supply Tunnel project

Retrieved on: 2025-04-02 11:36:08

Tags for this article:

Click the tags to see associated articles and topics

Beneath the surface: A look inside the $450M Annacis Water Supply Tunnel project. View article details on hiswai:

Excerpt

COURTESY METRO VANCOUVER — Lowering of concrete liners at the Annacis Water Supply Tunnel. Most construction sites are above ground or, in the case of ...

Article found on: canada.constructconnect.com

View Original Article

This article is found inside other hiswai user's workspaces. To start your own collection, sign up for free.

Sign Up
Book a Demo